Anacreon

Table: Constructions

Construction Tech Years Che Met Tri
command base s 6 460 2,300 180
industrial complex s 10 590 2,600 150
disrupter pg 8 1,110 1,180 1,120
fortress pg 12 840 2,870 250
gate g 15 2,530 3,920 1,450
outpost b 3 350 1,120 150
SRM s 2 110 500 80
warp link pg 5 1,560 2,550 290

This table lists the requirements for each type of construction. Tech is the minimum tech level required to start the construction. Years is the number of years that it will take to complete the project. Che, Met, and Tri are the amounts of chemicals, metals, and trillum needed per year of construction.